|
|
 |
|
 |
 |
Tanking systems for below ground applications ie water storage, under slab & footings. Lift wells. Commercial pre-cast concrete retaining panels, planter boxes.
|
|
*Click play to view video. Video may take 10 - 20 seconds to begin viewing on slow connections.
|
- Gussets
- Fillets in water sump
- Base sheet prep on pre pined tan ply
- Cap sheet in white
|
|
|
*Click play to view video. Video may take 10 - 20 seconds to begin viewing on slow connections.
|
- Nailing on prehydrated rawmatt
- Polystyrene Cover sheet
- Metal to back fill
|
|
|
*Click play to view video. Video may take 10 - 20 seconds to begin viewing on slow connections.
|
- Removing Packers
- Cleaning Concrete surface
- Rolling on primer
- Placement of peel and stick to footings approx 200 x 200
- 1st and 2nd sheets overlapping 100mm
- Polystyrene Glue Fixed
- Metal to back fill
|
|
|
*Click play to view video. Video may take 10 - 20 seconds to begin viewing on slow connections.
|
- Laying debo to footings
- Welding joints
- In preparation for steel caging and concrete pour for precast panels to stand on
|
|
Tanking - Duro Qik - Waterproofing Systems (Lining of water storage tank)
- Completion of roof construction (form work)
- Repair & prep to substrate (sika epoxy system)
- G.P primer to all services
- Elastofabric bandage (rubberised preformed internal & external corners)
- Three coat application
|
|
|
Tanking - Equus Duo (Planter Box)
- Two layer torch on
- Cap sheet impregnated with root inhibitor (Duo landscape range)
- Tank testing to ensure no water leaking to joints & penetrations
|
|
|
Tanking - Paraseal L.G. Equus
|
|
 |
|